Zaragoza Tram

Case studies

ZARAGOZA TRAM

Construction of the first tram line in Zaragoza, Spain. CAF is responsible for the electrification system, supply of trams, maintenance and workshop equipment. Extension of 12.8 km of line 1, a stretch of 2.2 km is without catenary.

Rolling stock and maintenance

  • The supply of 21 Urbos trams with an ACR system.
  • Rolling stock maintenance.
  • Equipping the workshops.

Energy and Electrification

  • The complete electrification of the system, including: 5 traction sub-stations, 6 power switching systems (for the catenary-free sections) and 2c10 kV power supply networks.

TURNKEY TRANSPORT SOLUTIONS OFFERED BY CAF ON AN INTERNATIONAL LEVEL

Other CAF study cases: metros, trams and commuter trains