VITORIA TRAM

In 2008, the city of Vitoria inaugurated their first tram line for which CAF supplied 11 trams between 2008 and 2009. This is a 100% low floor tram consisting of 5 articulated carbodies. It is metric gauge and bidirectional with two driver cabs. These trams are based on the URBOS solution developed by CAF for urban transport.

A standout feature is that it is designed as a modular system which allows for a seven module train consist by adding two intermediate modules to the basic consist.

Other Projects

Technical data sheet

  • CompositionMc-S-T-S-Mc
  • Train length (mm): 31.380
  • Total Passenger Capacity 261 (6p/m2)
  • Maximum speed (km/h) 70
  • Equipment
    • Train monitoring and control system
    • Cab-passenger communication system
    • Audio information system
    • Passenger information system
    • Event recorder
    • Video Camera
    • Obstacle detection system