TRAM METRO CENTRO WITH ACR EXTENSION

In 2011, CAF supplied 4 new trains with the ACR system for the operator TUSSAM in the city of Seville. These 100% low floor trams made up of 5 modules are based on the URBOS solution for urban transport.

The trams are fitted with an energy storage system on board the train, which accumulates braking energy and provides for the removal of electric lines between stops. This project therefore contributes to improved integration of the tram in the city of Seville, reducing the visual impact in the historic center thanks to travelling catenary free between station and the increase in energy efficiency.

Other Projects

Technical data sheet

  • CompositionMc-S-T-S-Mc
  • Train length (mm): 32.366
  • Total Passenger Capacity 279 (6p/m2)
  • Maximum speed (km/h) 50
  • Equipment
    • Cab air conditioning
    • Passenger saloon air conditioning
    • Audio and visual information for passengers
    • Events recorder (black box)
    • Control and supervision system
    • On board passenger counting system
    • Video surveillance
    • ACR