SYDNEY TRAM

This is CAF’s first contract in Australia. This new project includes the supply of 6 new trams including maintenance of existing units. The units will run on the Inner West rail extension linking the residential area to the City Centre.

These new trams are the most modern generation of the Urbos platform, 100% low floor, and comprising 5 modules. In addition, they provide the best tram vehicle passenger accessibility conditions available today.

In 2014, residents of Inner West will also have transport to the city centre, together with an extension of 5.6 kilometres on the Lilyfield to Dulwich Hill line.

Other Projects

Technical data sheet

  • Composition Mc-S-T-S-Mc
  • Train length (mm): 32.923
  • Total passenger capacity 338
  • Maximum speed (km/h) 80
  • Equipment
    • Cab and passenger saloon air conditioning
    • Radio
    • Event Recorder (OTMR)
    • CCTVs
    • Fire detection system
    • ATP System
    • Audio and visual information for passengers
    • Station announcer
    • Diagnosis and train control system